
Loading image...
September 25, 2025 at 10:56 PM
Urban and Landscape Planning of the Main Access Roads to Agadir’s Grand Stadium – CAN 2025
CAN 2025 Project
Development of “Taroudant” over a length of 3.1 km
Development of the “Ocean” entrance over a length of 2.2 km
Development of the “Souss” entrance over a length of 3.5 km
Construction of a linking road interconnecting the three main entrances over 2.2 km
Redevelopment of the peripheral roads of the Grand Stadium, including its esplanade and the accesses linking the stadium to the bypass road (VC)